Author : | Jinxing Xie; T. S. Lee; Xiande Zhao |
---|---|
Category : | Journal Article |
Department : | Supply Chain and Information Management |
Year / Month : | 2001 |
Source : | Or Transactions Vol.5, No.1, pp.39-46. (Official journal of China Operations Reseach Association) |
Abstract
- Sone inconveniences of unidirectional forward-pass heuristics for multi-item single-level capacitated dynamic lot-sizing problems are pointed out. After giving the necessary and sufficient conditions for a feasible solution, a feasibility procedure is suggested to overcome these inconveniences.
Related Publication
- Freezing the Master Production Schedule for Material Requirements Planning Systems under Demand Uncertainty
- The Effects of Forecasting Errors on the Total Cost of Operations
- A Feasibility Procedure for Unidirectional Forward-Pass Heuristics for Multi-Item Single Levle Capacitated Lot-Sizing Problems
- Freezing the Master Production Schedule under Single Resource Contstraint and Demand Uncertainty
- Accelerating the quadratic lower-bound algorithm via optimizing shrinkage parameter